My kitchen remodeling project is moving along. Yesterday, my brother and I installed the tile. I had never done tile before, so I was very lucky to have Steve around to help me out with that. It really wasn’t that hard of a job to do, although cutting it to fit around the electrical outlets was a tedious and exhausting process (especially considering the only tool we had to cut those L-shaped corners was a small hand saw). For every half-inch of cutting we needed to do on those porcelain tiles, it took about five minutes. Yes, my right arm was a bit sore this morning.
We installed the tile in the space above the sink, ran it the full length of the counter (about six and a half feet), and up to the bottom edge of the upper cabinets. It looks great, even without having the grout in there yet (hopefully, we’ll do that sometime this weekend).
I spent most of today spackling and putting primer on the walls where that oh-so-beautiful wallpaper used to be. Paint goes on tomorrow. Hey, I might actually finish this project!