My kitchen remodeling project is moving along. Yesterday, my brother and I installed the tile. I had never done tile before, so I was very lucky to have Steve around to help me out with that. It really wasn’t that hard of a job to do, although cutting it to fit around the electrical outlets was a tedious and exhausting process (especially considering the only tool we had to cut those L-shaped corners was a small hand saw). For every half-inch of cutting we needed to do on those porcelain tiles, it took about five minutes. Yes, my right arm was a bit sore this morning.
We installed the tile in the space above the sink, ran it the full length of the counter (about six and a half feet), and up to the bottom edge of the upper cabinets. It looks great, even without having the grout in there yet (hopefully, we’ll do that sometime this weekend).
I spent most of today spackling and putting primer on the walls where that oh-so-beautiful wallpaper used to be. Paint goes on tomorrow. Hey, I might actually finish this project!
Sounds like your kitchen is almost done,that’s great.Hope I get to see it next time I’m in town.
Good to see your website is back up and running.
Can’t wait to see your new kitchen.
Hi Jon,
Sounds like you are making progress. I’m like Chris and Kirstin. I can’t wait to see it. It’s a lot of work and you’ll be happy when it looks like you want it to look.